Industrial Unit Radiant Heating Solution - Bemrose Park

Industrial Unit Heating Solution

Powrmatic partnered with long-term installation specialist Tidyco to deliver an efficient and reliable heating solution for a large industrial unit at Bemrose Park. By combining proven radiant heating technology with expert installation, the project successfully transformed a previously unheated space into a comfortable and energy-efficient working environment.

 
  • “We’re really pleased with how this project came together. The client is very happy with the end result, and the Powrmatic PVL from SRP radiant heaters proved to be the best solution for the space. The service and support from Powrmatic throughout were excellent, which made the whole process straightforward from start to finish”

    David Hithersay - Tidyco, Climate Control Divisional Director

Project Background

The project involved Unit 3 at Bemrose Park, a 1,600 square metre industrial space that required a complete heating solution as the building was previously unheated. A key challenge was the gas supply, located approximately 40 metres away within the main building. To address this, a 100mm stainless steel press-fit gas line was installed to a dedicated sub-meter. In addition to the heating works, Tidyco carried out a full electrical installation, including upgrading all high bay lighting to energy-efficient LED fittings.

Project Solution

Tidyco installed five 40kW Powrmatic PVL Push Linear Radiant heaters from SRP, configured across three zones and controlled via MC200 controllers for efficient temperature management. The Powrmatic PVL Push Linear Radiant heaters from SRP were selected for their ability to deliver direct, efficient heat in large open spaces, making them ideally suited to the building’s requirements.

Project Result

The installation of the Powrmatic PVL Push Linear Radiant heaters from SRP from Tidyco has transformed the unit into a warm and comfortable working environment, with efficient zoned heating ensuring energy is used effectively. Despite the initial challenges around gas supply, the project was delivered smoothly, and the end client is very satisfied with the outcome.

 

0
sq ft building
0
Radiant Heaters
0
m² Industrial Unit
0
Powrmatic Solution

Not sure what you need?

Free site survey

We’ll visit your site, assess your needs, recommend the right products and local installer or supplier.

Already know what you need?

Find an Installer

It’s easy to find your local Powrmatic installer who will provide you with a full supply and installation cost.