Hybrid Air Rotation & Heat Pump Climate Control – Powrmatic Warehouse
Hybrid Air Rotation System
Powrmatic has successfully designed and installed its pioneering AirRoteX-H Hybrid Heat Pump Air Rotation Unit at its own warehouse facility in Somerset. The project was undertaken to demonstrate how hybrid HVAC technology can transform heating performance in large industrial spaces while supporting decarbonisation goals and improving operational efficiency. Installed within Powrmatic’s 50m x 50m x 8m warehouse, the system provides consistent environmental control across the entire building envelope. The project serves as a live demonstration site, enabling consultants, contractors and end users to see the technology performing in real-world conditions.
