Topps Tiles - Frost Protection

“Due to the necessity to provide heating to prevent the sprinkler system freezing, we required a solution using Powrmatic TE units to heat the building to approximately 8°C uniformally, to prevent frost damage at any point within the warehouse.”

Project Background

Herbert Baggeley Construction Ltd (Main Contractor for this project) worked with Powrmatic in designing and installing the a heating system for Home improvement retailer Topps Tiles who took possession of a 53,280m3 warehouse facility in Leicester.

Solution

A frost protection scheme was specified by consultants Chapman & Partners International. Powrmatic’s Powrmaster TEG41/M air rotation unit was specified to provide frost protection for this new warehouse facility in Leicester. The 190kW provides a superb frost protection solution for this 53,580m3 facility. The units were Installed externally along the rear wall where the air can be fully recirculated or have a fresh air input.

Result

The warehouse measuring a massive 156m x 134m x 17m now benefits from a energy efficient warm air heating solution 24 hours per day through only one heater. A key factor is choosing this technology was they has already experienced the efficiencies of such product in their other facilities making the choice of the TE warehouse heater an obvious and preferred choice.

Building Requirements
Building Operation24 hrs per day
Building Dimensions (lxwxh)156m x 134m x 17m
Building Heating Load Requirement700kW
 